Compare 950mm-wide chrome towel radiators with 900mm pipe centres. Choose a height that fits your wall and check the listed heat output for your room.
Quick BTU calculatorEstimate your room’s heat requirement here, then compare the radiators below.
5 of 5 radiators · Available items first
Compare 950mm wide towel radiator chrome
| Model | Finish | Width | Height | Pipe centres | Bar layout | Listed heat output |
|---|---|---|---|---|---|---|
| 950mm / 400mm Towel Radiator Chrome Flat | Chrome | 950 mm | 400 mm | 900 mm | 3 + 4 = 7 bars | 1,025 BTU/h · 300 W |
| 950mm / 600mm Towel Radiator Chrome Straight | Chrome | 950 mm | 600 mm | 900 mm | 3 + 4 + 4 = 11 bars | 1,596 BTU/h |
| 950mm / 800mm Towel Radiator Chrome Straight | Chrome | 950 mm | 800 mm | 900 mm | 3 + 4 + 8 = 15 bars | 2,168 BTU/h · 636 W |
| 950mm / 1000mm Towel Radiator Chrome Straight | Chrome | 950 mm | 1,000 mm | 900 mm | 4 + 4 + 4 + 7 = 19 bars | 2,739 BTU/h · 803 W |
| 950mm / 1200mm Towel Radiator Chrome Straight | Chrome | 950 mm | 1,200 mm | 900 mm | 4 + 4 + 5 + 10 = 23 bars | 3,311 BTU/h · 971 W |
Help choosing your radiator
Useful guides for the sizes and finishes you’re browsing.
Choosing a wide radiator
Plan the width, connections and heating output before ordering.
Read guide →Check replacement fit
Measure pipe centres, projection, valves and bracket positions.
Read guide →Check the heat output
Understand rating conditions and lower-temperature heating.
Read guide →Choosing a towel rail for a family bathroom?
Compare towel capacity, under-window sizes and heat output.
Read guide →Compare 950mm-wide chrome towel radiators with 900mm pipe centres. Choose a height that fits your wall and check the listed heat output for your room.
Check the full wall width and access around nearby fittings before ordering a wider rail. A lower-height model may fit beneath an obstruction, but its heat output still needs to meet the room’s requirement.
Wall brackets, an air vent and a blanking plug are included with towel radiators. Valves are optional. Ask your installer to confirm the connections and any electric or dual-fuel requirements.